Screenshot 2026-01-29 204600.png
Screenshot 2026-01-29 204636.png
1/2

HC Valley Battery Producer [100% EFF] [SMALLEST POSSIBLE FULLY INTEGRATED]

2831

22

0

Erstellt 29. Jan. 2026
Aktualisiert 29. Jan. 2026

10 output lanes with integrated sandleaf production. Takes up 30u of depot space, and is 25u long. Cannot be adapted for base powering and is more of a thought exercise in space optimization. SELF-TILING NOTE: The 3 facilities highlighted in the 2nd image need to be powered by an external pylon placed outside the factory area. This works for all** outposts/main hub. When placing this blueprint side by side, this powering is handled by the pylon on the bottom left corner of the 1st image. **except if you shove this in the corner made by the depot bus in the main hub because the pylon can't reach across the depot

Kommentare (2)

Melden Sie sich an, um an der Unterhaltung teilzunehmen.

@user_wDI1ypJdFvcKLOTq

4. Feb. 2026

EU Code : EFO0158OoAo34Eu2eIoe

@SMKurama

30. Jan. 2026

Peak! <3