

1/2
LC Wuling Battery (Tileable)
1,1 rb
5
0
Dibuat 28 Jan 2026
Diperbarui 28 Jan 2026
Needs to be placed on a depot bus. Start the plant loop with Sandleaf. Tileable, so you can place these without gaps on the bus. At full inputs, the packaging unit will operate with 100% utilization.
Komentar (1)
Masuk untuk bergabung dalam percakapan.
@Lit4er
17 Feb 2026
great