

1/2
Cuprium Ore Refining Unit (180/min)
71
1
0
Dibuat 21 Apr 2026
Diperbarui 21 Apr 2026
Requires 3 Clean Water Fluid Pumps input through the Conduit Outlet Manifold. You can choose to send the sewage to the Water Treatment Units or to your own facility connected to the Conduit Inlet. Remember to turn off the unused Water Treatment Units to save power or remove them if you have reached the build limit.
Komentar (0)
Masuk untuk bergabung dalam percakapan.
Belum ada komentar. Jadilah yang pertama untuk berbagi pemikiran Anda.