LC Wuling Battery.jpg
ENDFIELD_SHARE_1769639228.png
1/2

LC Wuling Battery (Tileable)

1,1 mil

5

0

Criado 28 de jan. de 2026
Atualizado 28 de jan. de 2026

Needs to be placed on a depot bus. Start the plant loop with Sandleaf. Tileable, so you can place these without gaps on the bus. At full inputs, the packaging unit will operate with 100% utilization.

Comentários (1)

Entre para participar da conversa.

@Lit4er

17 de fev. de 2026

great