

1/2
PURPLE BATTERY FOR SUB-PAC
1,2 mil
6
0
Criado 7 de fev. de 2026
Atualizado 7 de fev. de 2026
Perfectly fit in fully upgraded Sub-PAC in Valley IV (Totally usable in Main HUB too). Symmetrical design, no downtime, and no bottleneck. Product: 1 HC Valley Battery/10 seconds, or 360 units/hour You may switch the thermal bank and the protocol stash with each other depending on your power needs Also, you can use the rest of the area in the Sub-PAC base to plant 2 sandleaves (1 sandleaf and 1 shredded sandleaf) that are needed. You will get extra sandleaf powder every 2 seconds that you can use somewhere else or just sell it in the depot quest every once in a while.
Comentários (1)
Entre para participar da conversa.
@ZyreX
15 de fev. de 2026
Thankyou I was looking for a good battery blueprint