
Cuprium Ore Refining Unit (120/min)
144
3
0
Criado 13 de mar. de 2026
Atualizado 13 de mar. de 2026
Requires 2 fluid pumps input or 2/s of clear water through the conduit outlet. You can choose to send the sewage to the water treatment unit or to your own facility connected to the sewage conduit inlet. Update/Change Log: - (Ver 1.1) Changed the fluid piping and added one sewage conduit inlet, because the pipe will get clogged if there are more than 3 facilities connected to a single pipeline in serial connection.
Comentários (0)
Entre para participar da conversa.
Ainda não há comentários. Seja o primeiro a compartilhar seus pensamentos.