

HC Valley Battery Producer [100% EFF] [SMALLEST POSSIBLE FULLY INTEGRATED]
2.8K
22
0
10 output lanes with integrated sandleaf production. Takes up 30u of depot space, and is 25u long. Cannot be adapted for base powering and is more of a thought exercise in space optimization. SELF-TILING NOTE: The 3 facilities highlighted in the 2nd image need to be powered by an external pylon placed outside the factory area. This works for all** outposts/main hub. When placing this blueprint side by side, this powering is handled by the pylon on the bottom left corner of the 1st image. **except if you shove this in the corner made by the depot bus in the main hub because the pylon can't reach across the depot
ความคิดเห็น (2)
เข้าสู่ระบบเพื่อเข้าร่วมการสนทนา
@user_wDI1ypJdFvcKLOTq
4 ก.พ. 2569
EU Code : EFO0158OoAo34Eu2eIoe
@SMKurama
30 ม.ค. 2569
Peak! <3