IMG_0049.png
IMG_0050.png
IMG_0051.png

Switchable LC Wuling Battery CW

249

1

0

สร้างเมื่อ 17 ก.พ. 2569
อัปเดตเมื่อ 18 ก.พ. 2569

Can remove center pylon to switch off the part unneeded for the xiranite gear components part that have to be switched on by placing a center pylon. Besides placing the blueprint down, the user have to: - (Optional) Make sure main base is placed where the spawn point is next to zipline connected to the farm through the river. - Have 1 Fluid Pump flowing water through a pipe splitter for 2 Forge of the Sky for both the ACW and CW Switchable LC Wuling Battery blueprints. - Have another 1 Fluid Pump for 2 Jincao ACW Production lines for both the ACW and CW main blueprints. Can place them in the empty space between the main base and ACW blueprint. - Have 2 x 2 Sandleaf Production lines (Also can be 3 if have stockpile) for both ACW and CW main blueprints. Can place one of the CW ones output to main base between the CW main blueprint and main base for ease to switch off to save power when making xiranite gear components. Stock Bill Rate: 2.2733 $/s for each LC Wuling Battery

ความคิดเห็น (0)

เข้าสู่ระบบเพื่อเข้าร่วมการสนทนา

ยังไม่มีความคิดเห็น เป็นคนแรกที่แบ่งปันความคิดของคุณ