ENDFIELD_SHARE_1776631050.png
Screenshot From 2026-04-19 13-45-59.png
1/2

Compact Hetonite Part (30u/m full efficiency)

337

5

0

Đã tạo 19 thg 4, 2026
Đã cập nhật 19 thg 4, 2026

Requires 1u/s acid on top right reactor (1 pump) and 2u/s acid on bottom right reactor (2 pumps). This consumes a whopping 240u/m of cuprium. Right now we're limited to 180u/m of cuprium ore with the current nodes available, but if you intend to use all of your cuprium for hetonite part production then this will do it.

Bình luận (1)

Đăng nhập để tham gia cuộc trò chuyện.

@Odis

15 thg 5, 2026

30u/min is false, thats impossible with this setup. The fitting unit for hetonite part takes 10 seconds per part, so maximum is 6u/min. I have it at full efficiency, exactly like your images, and the theoretical yield and current yield is 6/min. Other parts, like Amethyst and Cuprium parts take 2 seconds in the fitting unit, so that might be where your misunderstanding came from