

1/2
Full Auto Heavy Xiranite Over-flow prevention blueprint (design for up to 36/min Heavy Xiranite production line)
34
0
0
Đã tạo 1 thg 11, 2026
Đã cập nhật 1 thg 11, 2026
This setup uses the Expanded Crucible’s automatic multi-recipe unclogging feature to dispose of excess Heavy Xiranite, so the Heavy Xiranite line doesn’t back up and cause Cuprium to back up, which would leave the SC Wuling Battery production line without enough Sewage, which would halt SC Wuling Battery production, which would cause a total blackout across the entire base. This setup can handle a Heavy Xiranite production rate of up to 36 units per minute. This set up is recommond to be use in First Pier factory area [UpperFirstPier]EFO01u8U459u4I0auAoOU [LowerFirstPier]EFO01I3A5O6I5o9715o08
Bình luận (0)
Đăng nhập để tham gia cuộc trò chuyện.
Chưa có bình luận nào. Hãy là người đầu tiên chia sẻ suy nghĩ của bạn.