
Fully optimized & symmetric HC Valley Battery blueprint
1.4K
6
0
Created Jan 27, 2026
Updated Jan 27, 2026
IMPORTANT: -It was made to fit on a FULLY LEVELED UP Sub-PAC, meaning you need to unlock all the area expansion and depot bus. -Note that you will additionally need 2 Sandleaf farms on the side. YIELD: -6 HC Valley Battery / minute. ADDITIONAL NOTES: -It is normal for one of the Shredding Unit processing Sandleaf to be clogged during a short period. -The design is fully symmetrical. -It can propably still be optimized in term of shape and space taken.
Comments (1)
Sign in to join the conversation.
@user_SDBLpaLXYswqjuId
Jan 30, 2026
Beautiful symetry thanks