


1/3
HC Valley Battery 谷地紫电池
378
5
0
Created Jan 28, 2026
Updated Jan 28, 2026
3/min output plus 2200 power, discard thermal bank if not needed 产能3个/分,剩下三个拿来发电了(功率2200),不用发电的话把热能池拆了就行 蓝图结构截图都有,其他服务器需要也可以照着建 比较吃砂叶,需要两个种植机支撑 占地很大,会用掉几乎所有仓库和三个中枢的输出口 side product: 30 sandleaf powder/min 副产物:每分钟30砂叶粉末
Comments (0)
Sign in to join the conversation.
No comments yet. Be the first to share your thoughts.