battery.png

Purple Battery, perfect for Sub-PAC

1K

6

0

Created Jan 30, 2026
Updated Jan 30, 2026

Perfectly fit in fully upgraded Sub-PAC in Valley IV (Totally usable in Main HUB too). Symmetrical design, no downtime, and no bottleneck. Materials used: -4 ferrium ores (120/minute) -6 originium ores (180/minute) -1 sandleaf (30/minute) -2 sandleaf powders (60/hour) Product: 1 HC Valley Battery/10 seconds, or 360 units/hour You may switch the thermal bank and the protocol stash with each other depending on your power needs Also, you can use the rest of the area in the Sub-PAC base to plant 2 sandleaves (1 sandleaf and 1 shredded sandleaf) that are needed. You will get extra sandleaf powder every 2 seconds that you can use somewhere else or just sell it in the depot quest every once in a while.

Comments (0)

Sign in to join the conversation.

No comments yet. Be the first to share your thoughts.