ENDFIELD_SHARE_1770901274.png
Screenshot (26).png
1/2

PAC Power Plant Wuling 3200+ Kwh (6/minute)

860

2

0

Created Feb 12, 2026
Updated Feb 12, 2026

[PAC Power Plant Wuling 3200+ kWh] Stop letting your PAC sit idle! This blueprint is specifically designed to empower your PAC/Sub-PAC by turning them into a massive power plant. The base layout is perfectly aligned with the PAC/Sub-PAC output ports for seamless integration. Technical Specs: Production Output: Generates 6 Wuling KR Batteries per minute. Power Generation: 3200 kWh total (powered by 2 Thermal Bank units, 1600 kWh each). Efficiency: 100% optimized. Every resource input and output is calculated to ensure zero waste. Dual Purpose: The production is so steady that it fills 2 Thermal Banks easily (50/50). I’ve routed the excess to a Protocol Depot so you can sell the surplus for Stock Certificates. Note: With 1 PAC and 1 Sub-PAC using this setup, you’ll reach 6400+ kWh. It’s highly efficient, though the layout is slightly asymmetrical due to the facility ratios.

Comments (0)

Sign in to join the conversation.

No comments yet. Be the first to share your thoughts.