3.png

Purple Battery Factory ONLY for Wuling Base

165

1

0

Created Mar 17, 2026
Updated Mar 19, 2026

This factory produces 1 purple battery per minute, which, added to a thermal bank powered by Wuling batteries (02), is enough to maintain an energy consumption of up to 4500. This method helps to avoid consuming so many level 2 Wuling batteries. Of the 12 produced per minute, only 1 is consumed.

Comments (0)

Sign in to join the conversation.

No comments yet. Be the first to share your thoughts.