屏幕截图 2026-10-31 220055.png
屏幕截图 2026-10-31 220100.png
1/2

Full Auto Heavy Xiranite Over-flow prevention blueprint (design for up to 36/min Heavy Xiranite production line)

34

0

0

Создано 1 нояб. 2026 г.
Обновлено 1 нояб. 2026 г.

This setup uses the Expanded Crucible’s automatic multi-recipe unclogging feature to dispose of excess Heavy Xiranite, so the Heavy Xiranite line doesn’t back up and cause Cuprium to back up, which would leave the SC Wuling Battery production line without enough Sewage, which would halt SC Wuling Battery production, which would cause a total blackout across the entire base. This setup can handle a Heavy Xiranite production rate of up to 36 units per minute. This set up is recommond to be use in First Pier factory area [UpperFirstPier]EFO01u8U459u4I0auAoOU [LowerFirstPier]EFO01I3A5O6I5o9715o08

Комментарии (0)

Войдите, чтобы присоединиться к разговору.

Пока нет комментариев. Будьте первым, кто поделится своими мыслями.