ENDFIELD_SHARE_1776631050.png
Screenshot From 2026-04-19 13-45-59.png
1/2

Compact Hetonite Part (30u/m full efficiency)

337

5

0

创建时间 2026年4月19日
更新时间 2026年4月19日

Requires 1u/s acid on top right reactor (1 pump) and 2u/s acid on bottom right reactor (2 pumps). This consumes a whopping 240u/m of cuprium. Right now we're limited to 180u/m of cuprium ore with the current nodes available, but if you intend to use all of your cuprium for hetonite part production then this will do it.

评论 (1)

登录以参与讨论。

@Odis

2026年5月15日

30u/min is false, thats impossible with this setup. The fitting unit for hetonite part takes 10 seconds per part, so maximum is 6u/min. I have it at full efficiency, exactly like your images, and the theoretical yield and current yield is 6/min. Other parts, like Amethyst and Cuprium parts take 2 seconds in the fitting unit, so that might be where your misunderstanding came from